< Permit #14 - Jeff Goble

Permit Information:

Permit Date:
11/21/2019
Project Name:
Project Type:
Description:
New Construction
Residential/ Commercial:
Residential
Permit Type:
Building
Applicant Name:
Jeff Goble
Project Cost:
125000
Square Footage:
10,000
Construction Type:
Use:
Fire Sprinkler?:
Floodplain?:
Status:

Property Information:

Parcel #: 060170021
850 Maple St
Riverdale, UT 84405

Owner Information:

Adrian Stewart
850 Maple St
Riverdale , UT 84405

Inspections:

3- Framing
- Chris
Scheduled Date:
Completed Date:

Items:

  • Anchor bolt spacing -
  • Attic ventilation & access -
  • Earth Wood Separation -
  • Escape window area & sill height -
  • Fire blocking @ vertical to horizontal -
  • Floor framing per plan -
  • Floor nails are properly flattened -
  • Headers per plan -
  • Lateral support joist/rafter -
  • Min Ceiling height -
  • Nail Plates -
  • Nate Test -
  • Plate Straps -
  • Roof framing per plan -
  • Roof nail -
  • Safety Glazing -
  • Shear panel location & nailing -
  • Stairs rise and run -
  • Stud & joist notching & boring -
  • Three stud at corner & intersecting walls -
  • Tie downs, shear transfer nailing -
  • Trusses per truss layout -
  • Underfloor access/ventilation -
  • Wall framing size, spacing -
  • Windows in and flashed -
------------------------
6- Electrical
005: Pending - Dennis Sperry
Scheduled Date:
Completed Date:
- Needs this done by March 15th if possible

Items:

  • 4 Way Breaker Installed -
  • Circuit breaker and wire size -
  • Gfi protected outlets where appropriate -
  • Ground & neutral grounded at main -
  • Grounding electrode/conductor -
  • IC Cans at insulation areas -
  • Light and exterior door -
  • OESC 250.32 (B)(1) Grounded Systems Supplied by a Feeder or Branch Circuit. Exception No.1: For existing and new installations made in compliance with previous editions the 2005 edition of this Code that permitted such connection, the grounded conductor run with the supply to the building or structure -
  • Outlets spacing -
  • Panel Rating -
  • Switched light/receptacles -
  • Temp. Power, GFI -
  • -
  • -
  • Water Pipe Bonding -
  • Wire/conduit support -
------------------------
1- Set Back
005: Pending - Chris
Scheduled Date:
Completed Date:
- test
------------------------
2- Foundation
005: Pending - Chris
Scheduled Date:
Completed Date:
- test
------------------------
5- Mechanical
005: Pending - Chris
Scheduled Date:
Completed Date:
- test

Plan Reviews:

09/23/2020 - 1- Development Review Commitee
Approved - Adam Howard
Date: 09/23/2020
Completed Date: 09/23/2020

Items:

  • All committee members have seen plans? -
  • Plans are clear and concise with architectural markings? -
  • Final Review timeframe established -
------------------------
09/23/2020 - 1- Development Review Commitee
Approved - Adam Howard
Date: 09/23/2020
Completed Date: 09/23/2020

Items:

  • All committee members have seen plans? -
  • Plans are clear and concise with architectural markings? -
  • Final Review timeframe established -
------------------------
11/21/2019 - 1- Development Review Commitee
Approved - Scott Jardine
Date:
Completed Date:

Fees:

*Building Permit Fee:
$22.00
Inspection Fee:
$50.00
Building Plan Check:
$100.00
BLDG Permit Fee:
$25.00
Building Permit (Finished SQ FT):
$250.00
Alix Inspections:
$0.00 - Paid
*Building Permit Fee:
$504.00

Total Fees:
$951.00
 

Amount Due:

$951.00

Submit Payment

Letters:

01/27/2020 - T1 Building Permit
11/21/2019 - T1 Building Permit
11/21/2019 - T1 Construction Permit
11/21/2019 - T1 Zoning Permit
11/21/2019 - T1 Building Placard

Uploaded Files: