< Permit #9 - Juan Ortiz

Permit Information:

Permit Date:
11/21/2019
Project Name:
Project Type:
Description:
Remodel Home
Residential/ Commercial:
Residential
Permit Type:
Remodel
Applicant Name:
Juan Ortiz
Project Cost:
50000
Square Footage:
1,000
Construction Type:
Use:
Fire Sprinkler?:
Floodplain?:
Status:

Contractors:

123 Contracting - Concrete, 357 South East Way Globe Arizona 84010
Primary Contact: Jack Larsen

Property Information:

Parcel #: 061370013
1123 W 4250 S
Riverdale, 84405

Owner Information:

Rob Roy

Inspections:

1- Set Back
-
Scheduled Date:
Completed Date:
------------------------
1- Set Back
001: Open - Chris
Scheduled Date: 09/17/2020 @ 11:30am
Completed Date:
- test2

Items:

  • Front easement meets zoning requirement (30 ' 6") -
  • Must be 30 feet from property line -
  • Set back inspection item 4 -
  • Side easement meets zoning requirement (see plans) -
  • Zoning Review -
------------------------
9- Final Inspection
- Adam Laing
Scheduled Date: 09/21/2020 @ 03:30pm
Completed Date:
- test2

Items:

  • Address numbers posted - Pass
  • Attic Access/ventilation -
    - THis failed because it has not been cut out yet. Need to do ASAP
  • Back-flow device at hose bibbs -
  • Breakers marked in panel -
  • Cleanouts accessible -
  • Comb. air for FAU or water heater -
  • Cover plates (weather at exterior) -
  • Earthquake strap at water heater -
  • Fireplace glass doors/spark arrestor -
  • Follow up -
  • Garage door self closing/solid core -
  • GFI -
  • Insulate water lines at water heater -
  • Landings -
  • Lights and fixtures in place -
  • No double dead bolts- Meaning you can't have more than one bolt within 1 inch -
  • Paint ABS vents thru roof -
  • Plumbing hooked up &complete -
  • Seal base of fixtures -
  • Slope away from house -
  • Smoke Detectors -
  • Special inspection reports -
  • Stair railings and handrail -
  • SWPP -
  • T&P for water heater -
  • Tempered glass -
  • Trash/debres Cleaned Up -
  • Ufer ground/ground connection -
  • Vent caps -
------------------------
2- Foundation
- Adam Laing
Scheduled Date: 09/21/2020 @ 08:30am
Completed Date:
- test2

Items:

  • Distance to property lines -
  • Distance to sloped bank -
  • Final compaction report -
  • Footing size per plan -
  • Hold downs -
  • Overall Approval of Foundation -
  • Protection of U.G. Pipe -
  • Steel laps & earth clearance -
  • Steel/mesh per plan -
------------------------
5- Mechanical
- Adam Laing
Scheduled Date: 09/21/2020 @ 12:00pm
Completed Date:
- test2

Items:

  • -
  • Combustion Air Provided -
  • Duct support/insulation -
  • Return air/ supply air/ combustion air -
  • Vent clearances -

Plan Reviews:

12/28/2020 - 1- Development Review Commitee
Approved - Adam Howard
Date: 12/28/2020
Completed Date: 12/28/2020
- thisisatest

Items:

  • All committee members have seen plans? -
  • Plans are clear and concise with architectural markings? -
  • Final Review timeframe established -
------------------------
09/02/2020 - 4- Department Review (Public Works)
Approved - Adam Howard
Date: 09/02/2020
Completed Date: 09/02/2020
------------------------
08/24/2020 - 1- Development Review Commitee
Approved - Adam Howard
Date: 08/24/2020
Completed Date: 08/24/2020

Items:

  • All committee members have seen plans? -
  • Plans are clear and concise with architectural markings? -
  • Final Review timeframe established -
------------------------
08/14/2020 - 1- Development Review Commitee
Approved - Adam Howard
Date: 08/14/2020
Completed Date: 08/14/2020

Items:

  • All committee members have seen plans? -
  • Plans are clear and concise with architectural markings? -
  • Final Review timeframe established -
------------------------
08/14/2020 - 1- Development Review Commitee
Approved - Adam Howard
Date: 08/14/2020
Completed Date: 08/14/2020

Items:

  • All committee members have seen plans? -
  • Plans are clear and concise with architectural markings? -
  • Final Review timeframe established -
------------------------
07/30/2020 - 5- Department Review (Engineering)
Deemed Incomplete - Adam Howard
Date: 07/30/2020
Completed Date: 07/30/2020
------------------------
07/13/2020 - 1- Development Review Commitee
Approved - Adam Howard
Date: 07/13/2020
Completed Date: 07/13/2020

Items:

  • All committee members have seen plans? -
  • Plans are clear and concise with architectural markings? -
  • -
------------------------
11/21/2019 - 1- Development Review Commitee
Approved - Scott Jardine
Date:
Completed Date:

Fees:

1:
$10.00 - Paid
Base Fee:
$60.00 - Paid
BLDG Permit Fee:
$524.18 - Paid

Total Fees:
$594.18
 

Amount Due:

$0.00

Payments:

Date:

Amount:

Type:

Paid By:

12/11/2020
$584.18
Amy Adams
03/19/2020
$10.00
John Doe
 

Amount Paid:

$594.18

Letters:

07/30/2020 - T1 Building Permit
07/30/2020 - T1 Building Permit
05/04/2020 - T1 Building Permit
11/21/2019 - T1 Building Permit
11/21/2019 - T1 Certificate of Occupancy
11/21/2019 - T1 Construction Permit
11/21/2019 - T2 Building Permit

Uploaded Files:

Messages: